May 2019
​
We were instructed to form a hard standing for a client in Telford, along with shrub and root removal, all spoil was kept on site and graded to level existing garden.
June 2019
​
We were instructed to form a hard standing for a client in Staffordshire. Existing Levels were reduced, with a layer of road stone and a final layer of tarmac plannings added.
July 2019
​
Using existing soil on site we were instructed to raise levels to form an accessible area for a parking area to be created at a later date.
October 2019
​
Remove existing driveway surface, and replace with new Geo-textile membrane and clean MOT roadstone 
November 2019 - June 2020
​
On hire to RPS & Apex Drilling carrying out Trial Pit Excavations for a new bypass in Shropshire