May 2019
We were instructed to form a hard standing for a client in Telford, along with shrub and root removal, all spoil was kept on site and graded to level existing garden.
June 2019
We were instructed to form a hard standing for a client in Staffordshire. Existing Levels were reduced, with a layer of road stone and a final layer of tarmac plannings added.
July 2019
Using existing soil on site we were instructed to raise levels to form an accessible area for a parking area to be created at a later date.
October 2019
Remove existing driveway surface, and replace with new Geo-textile membrane and clean MOT roadstone 
November 2019 - June 2020
On hire to RPS & Apex Drilling carrying out Trial Pit Excavations for a new bypass in Shropshire 
July 2020
Formation of new driveway 
August 2020
Built up levels using existing spoil and topped with 140 tonne of fresh topsoil to form new lawn and garden area, also formed a garden path, leveled existing driveway to be graveled at a later date.
September 2020
 
Site Clearance, Following some tree removal we were called to grub up, clear and level a field. Using our rake bucket attachment made light work of it. 