May 2019
We were instructed to form a hard standing for a client in Telford, along with shrub and root removal, all spoil was kept on site and graded to level existing garden.
June 2019
We were instructed to form a hard standing for a client in Staffordshire. Existing Levels were reduced, with a layer of road stone and a final layer of tarmac plannings added.
July 2019
Using existing soil on site we were instructed to raise levels to form an accessible area for a parking area to be created at a later date.
October 2019
Remove existing driveway surface, and replace with new Geo-textile membrane and clean MOT roadstone 
November 2019 - June 2020
On hire to RPS & Apex Drilling carrying out Trial Pit Excavations for a new bypass in Shropshire 
July 2020
Formation of new driveway 
August 2020
Built up levels using existing spoil and topped with 140 tonne of fresh topsoil to form new lawn and garden area, also formed a garden path, leveled existing driveway to be graveled at a later date.
September 2020
 
Site Clearance, Following some tree removal we were called to grub up, clear and level a field. Using our rake bucket attachment made light work of it. 
March 2021
 
We we instructed to repair an access track up to the top of the Wrekin Hill, initially we attended with the mini digger on a operated hire basis in January, we were than asked to return in March to finish the lower sections and create a delivery layby for future work on the tv transmitter. The JCB 3CX proving a very versatile machine, being able to complete all the tasks, including transporting the stone. 
June 2021
 
We we instructed to demolish a derelict sandstone cottage to prevent any danger to the public. The material was loaded on to trailers to be stored off site and later sorted into useable sandstone for use in the future. 